The artist’s impression below shows The Entrance Community Centre proposed development including Stage 2 and Stage 3. The proposed Entrance Men’s Shed is included in the Stage 2 and 3 development.
In the image below, The Shed is located on the right of the photo, a two tone shed in green and white at ground level. The awning is also shown in the illustration.
The Shed is adjacent to the the car park and faces in towards the main square of the Neighbourhood Centre.
